Temporary Steel Bridge Provides Safe Detour During Highway Construction in Texas
The following article and images were provided by Acrow.
Acrow, an international bridge engineering/supply company and SSSBA member, announced it has designed and supplied a modular steel bridge to carry detoured traffic during highway construction in Nacogdoches County, Texas.
After exploring other options, the temporary detour solution was selected as the best way to meet the unique needs of the project, while minimizing the disruption to travelers in a rural location where no reasonable alternate route was available.

A temporary detour solution from Acrow was selected as the best way to meet the unique needs of a highway project in Texas.
Temporary Bridge Provides Safe and Reliable Detour
Just east of the small city of Nacogdoches, an aging bridge on State Highway 21 over the Carrizo Creek was slated for replacement. The route is used by both commercial and non-commercial traffic, including the many tourists drawn to the year-round historical, cultural and natural attractions in the area.
When planning for the project began, keeping the same horizontal alignment of the existing roadway was considered a priority, and maintaining two lanes of traffic on the Texas DOT-designated Hurricane Evacuation Route was a legal mandate.
As a result, phased construction was not regarded as a viable option. With this method, possible intermittent lane closures could reduce traffic to a single lane, and keeping the alignment would have required adding a large shoulder to the old bridge to handle the two lanes of traffic in the subsequent phase.
Building the new bridge adjacent to the existing bridge was also discounted, as it would change the alignment and create adverse right-of-way impacts. Based on the success of prior projects within the district that had successfully utilized temporary detour bridges, the Lufkin District of Texas DOT ultimately decided to use a temporary detour bridge as it would offer an economical way to address these concerns, while reducing construction time and providing a safe and reliable detour route for travelers and a safer environment for workers.

A single-span Acrow 700XS bridge with an overall length of 130 feet and a roadway width of 24 feet was selected to accommodate two lanes of traffic.
Modular Bridge Keeps Projects on Schedule
The project contractor, Drewery Construction Co., Inc., selected a single-span Acrow 700XS bridge with an overall length of 130 feet and a roadway width of 24 feet to accommodate two lanes of traffic.
The modular steel structure was assembled on site beginning in September 2022 and installed in October using a full cantilever launch with an 80-foot launching nose. The temporary bridge will be in use until completion of the new bridge, now anticipated to be September 2023.
In addition to the clear safety benefits, Acrow’s modular bridges can help keep projects on or ahead of schedule. Providing a predictable, reliable detour route mitigates many of the economic costs associated with long-term construction including vehicle and freight delays as well as burdens to local businesses and inconvenience to the local community.
“Our versatile modular bridges provide a good solution for state DOTs and contractors needing reliable, cost-effective detour solutions,” said Acrow’s Director National Sales & Military Business Development, Eugene Sobecki. “The use of prefabricated bridging systems has grown significantly in recent years as government agencies continue to adopt Accelerated Bridge Construction methods over phased construction to significantly minimize work zone impacts and reduce costs.”
“Bridge rehabilitation and replacement projects are becoming more common as U.S. transportation infrastructure ages,” added Bill Killeen, Acrow’s CEO. “In addition to increasing safety for motorists, these urgently needed projects are integral to the economic health of the region and well-being of residents. Continued investment in critical transportation infrastructure through projects such as these plays an important role in ensuring our roads and bridges can meet the demands of today and tomorrow.”
View original article.
Learn more about Acrow’s solutions.
Contact Information
Eugene R. Sobecki
Acrow Corporation of America
Parsippany, New Jersey
esobecki@acrow.com
973.244.0080
Need Assistance With a Project?
Do you have questions or need support for a new or existing project? The Short Span Steel Bridge Alliance (SSSBA) offers free project assistance for bridge owners and designers in the U.S., Canada, and Mexico.
For assistance, please complete the project assistance form and a steel bridge expert will contact you directly.
Why use the SSSBA’s complimentary project assistance?
- Central source for consultation on code-compliant design of short span steel bridges.
- Industry experts with decades of knowledge on steel design and construction.
- National network of manufacturers and suppliers (U.S., Canada, and Mexico)
Education
Steel Bridges for Smarter, Faster Construction – On-Demand Steel Bridge Video Series
This three-part on-demand video series covers integral abutments, simple for dead continuous for live designs and prefabricated bridge options.
Case Study
Modular Steel Bridge Keeps Rural Wyoming Connected
Acrow’s modular steel detour bridge in Alpine, Wyoming, ensures safe traffic flow while the Salt River bridge undergoes repairs.
Case Study
Prefabricated Steel Detour Bridges Minimize Work Zone Impact of Highway Construction in Southern Indiana
SSSBA member Acrow supplied two prefabricated modular steel bridges to keep traffic moving during major infrastructure projects in Clark and Floyd Counties, Indiana.
Short Span Steel Bridges