Hawaii DOT Installs Prefabricated Steel Bridges to Lower Costs and Improve Climate Resilience

Hawaii DOT Installs Prefabricated Steel Bridges to Lower Costs and Improve Climate Resilience

The following article and images were provided by Acrow.

Located on Farrington Highway, a major coastal route on the Hawaiian Island of Oahu, Makaha bridges No. 3 and No. 3A were built in 1937. Although repaired over the years, the bridges had become structurally deficient and lacked adequate shoulders to safely accommodate an increasing volume of pedestrians and cyclists.

Slated for replacement, with original plans calling for reinforced concrete structures, the Hawaii DOT ultimately selected Acrow’s prefabricated steel bridges, as they would reduce construction costs while addressing the long-term effects of climate change and sea level rise.

Single clear-span structures were chosen over three-span structures (with piers in the stream) to further reduce the impact of rising water levels. In addition, rapid installation would reduce construction time and minimize impact on the public.

Hawaii DOT Installs Prefabricated Steel Bridges to Lower Costs and Improve Climate Resilience

The Hawaii DOT selected Acrow’s prefabricated steel bridges to reduce construction costs while addressing the long-term effects of climate change and sea level rise.

Modern Design Built for Safety and Durability

Two permanent Acrow bridges were provided to the project contractor, Grace Pacific LLC. Bridge No. 3 is 130 feet (39.62m) long, and Bridge No. 3A is 100 feet (30.48m) long. Each structure has two 11-foot-wide lanes (3.35m) with a 7.5-foot-wide shoulder (2.29m).

Designed to AASHTO HL-93, the bridges have epoxy decks and MASH-compliant Zoneguard steel barriers. The bridges have a variable superelevation of 3% on the roadway and 2% on the pedestrian section to comply with ADA requirements.

Because of the area’s harsh tropical marine environment, the steel structures have hot-dip zinc galvanization exceeding ASTM International requirements for more than 100 years of corrosion protection.

Accelerated Installation Minimizes Public Disruption

Originally planned to be built in place, the excessive length of available detour routes led to the decision to assemble the bridges off alignment and install them with a lateral slide.

The bridges were installed over two weekends in fall 2023, with each requiring a 72-hour closure of the highway.

Shortly after installation, each route was reopened to traffic. In addition to providing safe, reliable access for residents, Acrow’s bridges have improved hydraulic openings and are expected to withstand a 100-year flood event without overtopping.

Read the original case study from Acrow.

 

Related Resources: Prefabricated Bridges

Minnesota LTPA Webinar 2025 Short Span steel Bridges

Steel Bridges for Smarter, Faster Construction – On-Demand Steel Bridge Video Series

This three-part on-demand video series covers integral abutments, simple for dead continuous for live designs and prefabricated bridge options.

Acrow bridge Wyoming DOT prefabricated steel bridge modular

Modular Steel Bridge Keeps Rural Wyoming Connected

Acrow’s modular steel detour bridge in Alpine, Wyoming, ensures safe traffic flow while the Salt River bridge undergoes repairs.

Prefabricated Steel Detour Bridges Minimize Work Zone Impact of Highway Construction in Southern Indiana Acrow

Prefabricated Steel Detour Bridges Minimize Work Zone Impact of Highway Construction in Southern Indiana

SSSBA member Acrow supplied two prefabricated modular steel bridges to keep traffic moving during major infrastructure projects in Clark and Floyd Counties, Indiana.