Accelerated Bridge Construction Applications

Topics: Accelerated, Video

In this video lecture, Dr. Michael Barker (Director of the SSSBA Education Center / Professor of Civil and Architectural Engineering at the University of Wyoming) provides an overview of accelerated applications that engineers and owners can consider for their bridge replacement needs.

This lecture introduces innovations that use modular designs for foundation and superstructure systems – it also covers the innovative design, planning, construction, and material selection for building steel bridges using accelerated construction.

Accelerated bridge construction (ABC) has become an important part of the bridge industry since it:

  • Reduces on-site construction time
  • Reduces disruption to the public
  • Improves project delivery time
  • Improves worksite safety

The companies highlighted in this video include (click on the company name for a contact/additional information):

Related Resources: Accelerated Bridge Construction

MSC Rapid Response

Steel’s Swift Response: Flood-Damaged Bridge Replaced in 4 Months

SSSBA member High Steel Structures replaced a flood-damaged bridge in New York in only four months. (Article from Modern Steel Construction)

Acrow Temporary Bridge

Modular Steel Bridge Maintains Traffic During Bridge Replacement

A modular steel bridge from Acrow maintains heavy-duty truck traffic throughout a bridge replacement project in Utah.

Acrow Bridge Project New Jersey

Modular Steel Bridge Reduces Traffic Delays During New Jersey Highway Construction

A modular steel bridge from Acrow prevents travel disruptions by providing detours for locals and tourists in northern New Jersey.