Accelerated Steel: Achieving Speed in Steel Bridge Fabrication

Information provided by the National Steel Bridge Alliance

When it comes to increasing the speed of steel fabrication, cutting, fitting, welding, drilling, cleaning, and coating are only part of the equation.

You can also make steel fabrication faster by optimizing what goes on outside the shop, like getting materials, facilitating routine procedures, and coordinating inspection.

The key to accelerated steel bridge fabrication is seamless teamwork between the fabricator, owner, engineer, and contractor–and NSBA’s brand-new guide is designed to help you do just that.

Accelerated Steel: Achieving Speed in Steel Bridge Fabrication describes how each of these roles affects critical shop support activities, which can make or break the fabrication schedule. This guide describes the ideal schedule for every step of fabrication as well as the responsibilities for owners, designers, and general contractors.

Download the guide today to learn how to immediately speed up the steel bridge fabrication process. We recommend you use Adobe Acrobat to view it.

Download Information

Related Resources: Accelerated Bridge Construction

Minnesota LTPA Webinar 2025 Short Span steel Bridges

Steel Bridges for Smarter, Faster Construction – On-Demand Steel Bridge Video Series

This three-part on-demand video series covers integral abutments, simple for dead continuous for live designs and prefabricated bridge options.

Acrow bridge Wyoming DOT prefabricated steel bridge modular

Modular Steel Bridge Keeps Rural Wyoming Connected

Acrow’s modular steel detour bridge in Alpine, Wyoming, ensures safe traffic flow while the Salt River bridge undergoes repairs.

Prefabricated Steel Detour Bridges Minimize Work Zone Impact of Highway Construction in Southern Indiana Acrow

Prefabricated Steel Detour Bridges Minimize Work Zone Impact of Highway Construction in Southern Indiana

SSSBA member Acrow supplied two prefabricated modular steel bridges to keep traffic moving during major infrastructure projects in Clark and Floyd Counties, Indiana.